claim
Routine costs (Ei) in the allostatic load framework vary seasonally based on life-history stages such as breeding, migration, and molting.
Authors
Sources
- Allostasis revisited: A perception, variation, and risk framework www.frontiersin.org via serper
Referenced by nodes (3)
- breeding concept
- life history stages concept
- Allostatic load concept