measurement
A 2021 study by Aborn et al. found that if the Diablo Canyon nuclear reactor were reoriented to coordinate electricity generation, hydrogen production, and desalination, the resulting water production cost would range from $0.79/m3 to $0.98/m3.

Authors

Sources

Referenced by nodes (2)