procedure
The REGEN electric sector model scenarios are run under three carbon dioxide removal (CDR) availability conditions: no CDR, direct air capture (DAC) only, and DAC plus bioenergy with carbon capture and storage (BECCS).

Authors

Sources

Referenced by nodes (3)