reference
Tyler Westover et al. developed preconceptual designs for coupling power delivery between a 4-loop pressurized water reactor (PWR) and 100-500 MWe high-temperature steam electrolysis (HTSE) plants in an April 2023 report for Idaho National Laboratory.
Authors
Sources
- Nuclear Energy and Climate Change Mitigation www.everycrsreport.com via serper